View Our Catalog

SALES - NEW
Manufacturer of column mounted shoring systems, handset shoring systems and components, selling 15-20 exclusive products multinational and nationally. Newly manufactured products for all types of concrete structures. Distributors for over 6,000 products. Our reference files on discounted and new products include literature dating back well over 20 years. We can help potential buyers locate almost any concrete related products. Sixteen years of buyers and sellers have been computerized by product and customer types.

50K Column Jack
50K Column Jack
- One Man Unit - 30 lbs Lighter!
- Roller Part of Cast Body
- MORE DURABLE

New Quick Beam I, II, & III
New Quick Beam I, II, & III

New Shore X System
New Shore X System

BM Shores
BM Shores - See Catalog

 

STEEL FORM FABRICATION
Our fabricating plant is capable of fabricating special forms according to drawings provided by the customer. High quality is the only goal.

New Garage Beam System
New Garage Beam System
Denver, CO

New Garage Beam System
New Garage Beam System
Denver, CO

New Garage Beam System
New Garage Beam System
Denver, CO

Dam Arch Form Hardware
Dam Arch Form Hardware
Lake Martin, AL

Dam Arch Form Hardware
Dam Arch Form Hardware
Lake Martin, AL

 



USED & TRADE INS
New/Used - Because of our 16 years of tracking used materials, we may be able to obtain good used components at a savings. Contact us and we will do a complete search.


Rental Systems Available
Column Mounted Shoring
Advantages of Column Mounted Shoring

Handset Shoring

Handset Shoring – Rental & Sale

*Frame shoring 11K leg
*Frame shoring 25K leg
*Steel Shores
  4x4 Hardware

Sampson Post Shores 8800# AT 18’-0”

*Sampson Post Shores 8800# AT 18’-0”

-stepped pin release shore
  load when hit in reverse

Bridge Components

*25 & 50k Bracket Jacks
*25K Friction Collars – adjustable
*Bridge Overhand Brackets
*New 140K Bracket Jack
*M – Jacks

Rental Products

Rental Products

Column Clamps
Column Forms
Ellis Hardware
Quick Beams
Shoring
Spanall’s
Steel Pans
Trash Chutes
Steel Post Shores
Tumbuckles
Wall Forms
Radius Walers
Concrete Buckets

J & W Brackets & Strickland Type Jacks


Column Mounted Shoring
The basic premise is that if the columns can hold up the building they can hold the shoring.

 

 

 

 

 

 


This

 

 

 

 

 

 

 

 


Or This

Column Mounted Shoring Example 1

Column Mounted Shoring Example 2

Column Mounted Shoring Example 3


Flying – Column Mounted Shoring – 50K & 70K roller jacks and deck forms. Strickland type jacks utilized with either steel or wood jacks Field technical service. Brooks Miner has 24 years of experience in this method of shoring *Roll Culverts & tunnels *Fly condos, homes & offices.

Pre bid proposals are available.




Column Mounted Shoring, Beachcomber Condominium
Column Mounted Shoring
Beachcomber Condominium
Panama City Beach

Column Mounted, Tranquility Condominium
Column Mounted
Tranquility Condominium
Panama City Beach

Casino in Mississippi
Casino in Mississippi

Hardrock Hotel Orlando
Hardrock Hotel Orlando
Capform

Burt Concrete, Holiday Inn
Burt Concrete
Holiday Inn
Ocean City, MD

20 Story Condo
20 Story Condo
Puerto Ordaz
Venezuela


Advantages of Column Mounted Shoring

*High Floors
High Floors
Supported off columns
No shoring or reshoring

*Ground Slab not in
Ground Slab not in
Don't have to wait
Start shoring earlier
Finish earlier

*No Reshoring
No Reshoring
Subs work directly under shoring.
Early completion

*Faster Completion
Faster Completion
No reshoring to interfere with subs schedules. Owner
cuts interest expense & Generates income 30% Faster!

*Simple - Small crew
Simple - Small crew
Average 4-5 men versus 20-25 men for
handset sticks or frames
Cycle Faster - 30-40%

 
One-man Jack
One-man Jack
50K or 20K


Flying Systems – Subs using Stick type shoring actually penalize the owners of buildings by prolonging the cycle for each floor.

COMPARISON
"Sticks" 12,000 SF slab = 12-14 days
Column Mounted 12,000 SF = 5-6 days

Being conservative, you can say that the concrete frames will be completed 50% faster with column mounted shoring.

20 Story Building -
"Sticks" - 280 days
Column Mounted - 120 days
A 64% FASTER CYCLE!!!
(no mobilization time considered for either method)


Owner/Architects – Should evaluate building design to optimize efficient shoring methods instead of obsolete pans & beam & slab design.

Factors to consider in the design are:

  • Post tension building design
  • Columns/walls in line
  • Spandrel beams turned up (if required)
  • High strength concrete to enhance cycle


Modularized Frame Shoring – 11K & 25K Leg

Flying shoring for projects with a lesser reuse factor. It is often feasible to use modular 11K leg shoring that rolls and flies in sections up to 28’ long. Productivity is improved because shipping and re-erecting on each floor is reduced. All components connect together.

Modularized Frame Shoring


Post Shores – Rental by Shoreall Corp.

Post Shores

Samson 7’ 7” to 16’ 2” high capacity for truss reshoring and high floors. Galvanized with a quick release pin.

Standard shores are available for common applications #1, #2, #3, and #4. (Some used are generally available).

4 X 4 and 6 X 6 screw jacks available for use with wood shores of both sizes.


OTHER SERVICES

Scaffolding, Queen Building, Atlanta

Engineering
By our P.E., who is registered in three states.

Appraisals
Detailed evaluations and reports to lenders on current market value and forced or orderly liquidations.

Newsletter
Fax or e-mail your mailing address to receive our quarterly market value and forced or orderly liquidations.

Outsource Purchasing
Contract purchasing for large clients with multiple projects who desire to reduce costs as much as 20-25%.


View the index page






 
COMPANY
 
Catalog
  1A - Panels and Fillers
  1B Brackets
  Catalog
  Main Page






 

Sign In